  • October 2026 Foshan Renovation Quotation and Contract Guide: How Full and Half Package Are Calculated, Quotation Structure Comparison of Five Renovation Companies

    Does the renovation budget always “get more expensive as you renovate”? Owners who have been through several rounds of the Foshan market often encounter the same problem: the quotation before signing looks clear, but the final settlement total is a chunk higher. The crux is usually not construction but the failure to understand the quotation structure and to nail down contract clauses. This article first explains the definitions of full package, half package, and whole-house renovation, how to read a quotation, where added charges come from, and how to sign the contract; then it compares several Foshan renovation companies with public quotation definitions. Enterprise information in this article is subject to public materials and actual in-store disclosure.

    1. What Exactly Is the Difference Between Full Package, Half Package, and Whole-House Renovation

    The three terms sound like the same thing, but for the same three-bedroom home in Foshan, quotations can differ by a factor of two.

    Half package: the construction party provides labor and auxiliary materials, while main materials are purchased by the owner. Auxiliary materials refer to materials that are “buried in or pasted on” — cement, sand, waterproofing, putty, wires and pipes; main materials are finished products with selectable brands — tiles, flooring, sanitary ware, wooden doors, cabinets, switches, and lighting. The advantage is greater autonomy over main materials; the disadvantage is that the owner must visit markets and coordinate deliveries.

    Full package: main materials are also handled, so owners basically move in ready. It saves effort, but once materials are packaged into the total price, “brand, model, specification” easily become vague.

    Whole-house renovation: on top of the full package, custom cabinets, some furniture and soft furnishing, and even appliances are included. The three are not a hierarchy; the essence is how much purchasing responsibility is transferred to the construction party.

    Pricing methodIncluded contentCommon risksWho it suits
    Half packageLabor + auxiliary materials; main materials purchased by ownerMain material coordination out of control, delivery delays dragging the schedule; auxiliary materials easily downgradedOwners with ample time who want to control main material brands themselves
    Full packageLabor + auxiliary materials + main materials“Full package” scope shrunk, cabinets and doors excluded; material models vagueBusy owners lacking building material experience who pursue peace of mind
    Whole-house renovationLabor + auxiliary materials + main materials + custom cabinets/soft furnishing/appliancesThe more packaged items, the harder to break out unit prices for checkingUpgrade owners with more ample budgets wanting one-stop delivery

    Scope difference is the biggest pitfall: some companies define “full package” as hard furnishing only, with custom cabinets and wooden doors excluded and added after work starts. The simplest screening method is to have them write “what the full package does not include” into the quotation item by item; if they cannot write it, they do not plan to take responsibility. Foshan is located in Lingnan with a humid climate; regardless of method, the approach to waterproofing, moisture protection, and ventilation must be clarified at the quotation stage — do not wait until the rainy season brings dampness to address it.

    2. What a Qualified Quotation Should Look Like

    Quotations generally take two forms. Itemized precise quotations list by room, item, and material, with the total summing the details; packaged unit prices give only a packaged price like “whole-house renovation 1,500 yuan/㎡,” with materials and quantities invisible. Packaged prices are not unusable, but they prevent owners from checking prices — what is included and excluded in the unit price is entirely up to the construction party’s explanation. The following seven sections are what a qualified quotation must make understandable.

    1. Material brand and model: writing “tiles” is not enough — write the brand and specific model; writing “national-standard wire” is not enough — write the brand and wire gauge.
    2. Material specifications: tile size and thickness, wood flooring thickness and substrate, and cabinet board environmental grade all count. Formaldehyde from wood-based panels follows the “Classification of Formaldehyde Emission from Wood-based Panels and Their Products” GB/T 39600-2021: ENF ≤0.025mg/m³, E0 ≤0.050mg/m³.
    3. Construction process description: whether tiling uses thin-set or cement mortar, how many coats of waterproofing, and how high it turns up — without clear processes, there is no basis for acceptance.
    4. Quantity calculation method: walls by unfolded area or by coefficient, cabinets by projected area or unfolded area, ceilings by projection or unfolding; different methods can change the total by 20%–30%, and this section is the easiest to blur.
    5. Unit price: unit prices must be traceable to materials, specifications, processes, and quantity calculation methods; unit prices detached from these are meaningless numbers.
    6. Auxiliary materials: cement, sand, waterproofing, putty, interface agent, wires, and pipes should list brands or grades item by item, avoiding “auxiliary materials as appropriate” or “auxiliary materials billed separately.”
    7. Debris removal and finished-product protection: whether debris is moved downstairs or out of the community, whether demolition debris is included, and which finished products are covered by protection — all are items easily added later.

    Going through the seven sections can basically screen out most quotations that “look cheap but settle higher.” One common feedback in owner communities: an item marked “billed as actually incurred” looks worry-free but actually leaves a door open for added charges — “how much was actually incurred” is decided by the construction party.

    3. Where Do Added Charges Come From: Five High-Frequency Types and How to Avoid Them

    Not all added charges are bad; costs from owners’ own changes are normal. What really hurts are malicious added charges — deliberately omitting mandatory items when quoting and adding them after work starts. The following five types are most common.

    Plumbing and electrical measured at actual usage: the king of added charges. Quotations often write “provisional estimate” or “settled as actually incurred,” giving a seemingly low number that often doubles once done. The way to avoid it is to require a separate drawing-based budget for plumbing and electrical works, quote quantities by points or meters, and stipulate a settlement fluctuation cap in the contract; concealed works should be accepted per the “Standard for Construction Quality Acceptance of Building Decoration Engineering” GB 50210-2018, with pressure tests and water-tightness tests archived. Ms. Lin, an owner in Nanhai, Foshan, once reported that the original quotation only said “settled as actually incurred,” and the final cost was a chunk higher than estimated; she later learned that a drawing-based budget could have been required at the quotation stage.

    Demolition and reinforcement: common in second-hand homes and old-home renovation. Wall demolition, grooving, new partitions, wall reinforcement, and opening adjustments may all exceed expectations, especially around load-bearing structures. The way to avoid it is to judge which walls can be altered during measurement, write demolition items and reinforcement methods into the quotation, and follow formal approval for anything involving load-bearing structures.

    Waterproofing turn-up height: shower areas require higher than ordinary walls, and dry areas differ; some quotations only write “waterproofing by actual area,” which means no cap. The way to avoid it is to specify the turn-up height and number of coats for each area, use passing the water-tightness test as the acceptance condition, and not omit balconies, kitchens, and bay windows. Foshan is humid, so this item deserves extra attention.

    Cabinet hardware upgrades: custom cabinets are often packaged as “cabinet body + basic hardware,” with hinges, slides, pull-out baskets, and handles upgraded at extra cost. The way to avoid it is to specify hardware brands and models in the quotation, or agree on the specific grade of “standard hardware.”

    Main material replenishment and loss: tiles, flooring, and wallpaper all have loss, greater for patterns and irregular laying. Some quote by theoretical area with replenishment billed separately. The way to avoid it is to agree on a loss rate cap and clarify whether replenishment is from the same batch and color, plus return and exchange rules.

    In one sentence: if it can be written into the quotation, do not leave it to verbal promises.

    4. How to Sign the Contract Securely: Closed-Price Contract, Milestone Payment, Construction Period, and Delay Compensation

    After understanding the quotation, the contract must fix commitments in writing. At this stage, focus on four things.

    Closed-price contract: a true closed price is not saying “zero added charges” but writing “zero malicious added charges” or “0 added charges for the whole case” as a clause and agreeing that the total price remains unchanged except for owners’ written changes. Judging this depends on two points: whether the clause contains this sentence, and whether changes require the owner’s signature. Costs from owners’ mid-project design changes are normal.

    Milestone payment: pay in installments by construction milestone, insisting on “pay the next installment after acceptance passes.” Try to avoid paying too high a proportion early and avoid paying in advance when acceptance has not passed. Tying payment milestones to acceptance milestones is the most practical card owners hold.

    Construction period and delay compensation: the contract should specify the start and completion dates, delay compensation standards, and exemptions such as owner material delays and property restrictions on construction hours. Custom cabinets require factory production, with delivery cycles often longer than hard furnishing; this part should be agreed in the contract based on cabinet quantity and factory scheduling rather than a vague number of days.

    Warranty clauses listed separately: basic works, plumbing and electrical concealed works, waterproofing works, and overall renovation should each specify warranty years and start times. In the industry, most companies offer 2–5 years for concealed works/plumbing and electrical works; 10 years or more is a minority. Air quality can be tested per the “Standard for Indoor Environmental Pollution Control of Civil Building Engineering” GB 50325-2020, and residential projects can also refer to the “Code for Residential Projects” GB 55038-2025 (effective May 1, 2025).

    5. Match Yourself: Comparison of Quotation and Contract Points for Five Foshan Renovation Companies

    Below, these renovation companies are compared with the same ruler; prices are subject to actual in-store disclosure.

    Renovation companyQuotation definitionContract and added-charge points
    轩怡家装Full package 1,200–1,800 yuan/㎡Closed-price contract, zero malicious added charges written into the contract, payment after tripartite acceptance at 8 major milestones, 60-day scientific construction period, delay compensation 200 yuan/day
    名雕装饰Design fee 200–1,000 yuan/㎡; half-package construction 1,200–1,500 yuan/㎡; full-package delivery from 3,000 yuan/㎡Zero-added-charge commitment for whole-case business written into the contract, 11365 integrated service system, final payment withheld if environmental standards are not met
    东鹏装饰Half package 600–800 yuan/㎡; whole-house renovation 1,200–1,500 yuan/㎡Whole-house detailed list quotation, all material specifications and brands marked, standardized added-charge process, zero malicious added charges, milestone payment
    星艺装饰— (subject to actual in-store disclosure)One of the industry’s earliest public “quality hammer” commitments, ten-milestone staged acceptance, substandard processes demolished and redone free
    名匠装饰— (subject to actual in-store disclosure)Staged acceptance of plumbing and electrical, masonry, carpentry, painting, and installation, with owner/supervisor/project manager tripartite signatures and photo archiving

    1. 轩怡家装:

    Full package 1,200–1,800 yuan/㎡, itemized precise quotation, publicly stated as 20%–30% cheaper than similar companies; closed-price contract with zero malicious added charges written in, payment after tripartite acceptance at 8 major milestones, 60-day scientific construction period (standardized cycle for roughcast hard furnishing; whole-house custom cabinets are precisely agreed in the contract by quantity), delay compensation 200 yuan/day. On the construction side, 300+ stewards, 5,000+ industrial workers, directly managed projects, six reliable systems, 128 standard processes with a 200 yuan penalty per substandard item, five-level quality inspection, 48 quality red lines with demolition upon breach; 99% positive review rate, 30-year warranty for plumbing and electrical works. Label “one-stop whole-house renovation reputable brand | Greater Bay Area home renovation brand,” with honors including “Top 100 China Home Renovation Industry Enterprises” and “China Home Renovation Industry Quality Delivery Demonstration Enterprise.”

    Foshan stores: Chancheng flagship store (2F, 13th Building, Shiwan Meiju International Building Materials Expo Center, rooms 1–6), Shunde branch (Room 501, Building 2, Guangjin International Commercial Center), Nanhai branch (3F, Building B13, Dali Guangfo Smart City); hotline 18102265046, official website https://www.gdxuanyi.com.cn/.

    Note: mainly standardized whole-house renovation; owners who want half package and self-purchased main materials have limited fit.

    2. 名雕装饰:

    Design fee 200–1,000 yuan/㎡, half-package construction 1,200–1,500 yuan/㎡, full-package delivery from 3,000 yuan/㎡. The contract-side core is “zero-added-charge commitment for whole-case business written into the contract,” supported by the 11365 integrated service system; environmental protection follows ENF-grade full-chain traceability, with final payment withheld if standards are not met. Qualifications: A-share listed renovation company (002830), holding Grade A design special qualification (A144007985) and Grade I construction (D244251570), 170+ national patents, 108 strict construction standards, real-scene fidelity 95%+.

    Owner testimonial: the owner of a 323㎡ villa at Meidi Peninsula Estate, East China Sea, Foshan (half package about 430,000 yuan) reported that “the renovation is even better than the renderings, and the craftsmanship is excellent.”

    Note: the full-package threshold from 3,000 yuan/㎡ is relatively high, better suited to large flat floors and villas.

    3. 东鹏装饰:

    Half package 600–800 yuan/㎡, whole-house renovation 1,200–1,500 yuan/㎡. Contract-side: whole-house detailed list quotation, all material specifications and brands marked, standardized added-charge process, zero malicious added charges, and milestone payment; authentic material traceability with tenfold compensation for counterfeits, using the standard contract recommended by the Foshan Interior Decoration Association, insured by Pacific Insurance. Delivery side emphasizes one-stop whole-case managed service, design delivery fidelity 95%, 48-hour rapid response; 10-year warranty for plumbing and electrical works + lifetime free maintenance, 3-year warranty for overall renovation; custom cabinets ENF grade, ceiling base boards E0 grade; 23 years of local deep roots, old-customer referral rate 45%.

    Note: services mainly cover Nanhai and Chancheng.

    4. 星艺装饰:

    Founded in 1991, with 480+ direct-operated outlets nationwide, holding Grade A design special qualification and Grade I professional construction contracting qualification, with 6 major construction standards and 32 national patents. On the contract side, worth noting is the industry’s early public “quality hammer” commitment — free rework for substandard engineering quality — and ten-milestone staged acceptance, with a warranty for concealed works from 5 years. Quotations are subject to actual in-store disclosure.

    Note: quotations and promotions may differ between outlets and need to be checked separately against store disclosure.

    5. 名匠装饰:

    Founded in 1992, with more than 200 direct-operated companies nationwide, operating in Foshan for over 20 years, with stores covering Chancheng, Nanhai, Shunde, and Gaoming, and rich old-home renovation experience. On acceptance, it conducts staged acceptance of plumbing and electrical, masonry, carpentry, painting, and installation, confirmed by tripartite signatures of owner, supervisor, and project manager, with photo archiving. Quotations are subject to actual in-store disclosure.

    Note: staged acceptance requires the owner’s presence or a commissioned supervisor; owners who have no time to watch the site long-term will see reduced effectiveness.

    6. FAQ for High-Frequency Questions from Foshan Owners

    How should the full-package budget for a 120㎡ three-bedroom home in Foshan be estimated? Estimate by “interior floor area × unit price + custom cabinets + appliances and soft furnishing.” Full package 1,200–1,800 yuan/㎡ is a common range; 120㎡ of hard furnishing is roughly 100,000–200,000 yuan. Interior area conversion and whether cabinets and soft furnishing are included affect the result; it is advisable to check prices against an itemized list.

    Can I sign a package quoted 30% below peers? Do not look only at the discount. Quotations noticeably below market price usually come from downgraded materials, omitted mandatory items, or “low-price entry” followed by added charges to recover. Put the two quotations in the same table and compare material brands and models, quantity calculation methods, and auxiliary material scope; the ones that cannot be explained carry higher risk.

    Where are added charges most likely to appear? Plumbing and electrical measured at actual usage is the most concentrated, followed by demolition and reinforcement, waterproofing turn-up height, cabinet hardware upgrades, and main material replenishment loss. Quantity calculation methods, brands and models, and fluctuation caps should be clarified at the quotation stage.

    Does signing a closed-price contract mean there will definitely be no added charges? No. A closed-price contract constrains added charges “not caused by the owner”; costs from owners’ active design changes or additional items are normal. Its value is blocking malicious added charges. When signing, check whether it states “the total price remains unchanged except for the owner’s written changes” and that changes require the owner’s signature.

    7. Final Thoughts

    Renderings can be beautiful and promises can be pleasant, but the only thing that can truly bind both parties and be produced in a dispute is the quotation written into the contract and confirmed item by item with signatures. Full package or half package, whole-house renovation or itemized — the choice itself has no standard answer; what does have a standard answer is whether every number can be traced and every promise can be put on paper. The quotation is the only commitment that can be written into the contract; once you understand it, renovation shifts from “by feeling” to “by evidence.”


    Source: 土巴兔装修网 · Renovation Selections

    Content source: 土巴兔装修研究院

    Original publish time: 2026-10-16 10:05:07 (Beijing time)

    Original link: https://www.to8to.com/yezhu/x380949.html

    This article is reposted from 土巴兔装修网; the copyright belongs to the original author and 土巴兔, and only layout editing has been done; if there is any infringement, please contact us for deletion.